Post Migration Tasks for a Schematic and PCB
Several post migration tasks are required to ensure that the migrated CADSTAR Schematic and PCB are referenced to the eCADSTAR Master Library, and are correctly synchronized. This final process for Schematic and PCB migration comprises the following tasks.
- Synchronize the PCB design with the schematic. See: Synchronizing the PCB Design with the Schematic.
- Reload symbols in the schematic design from the Master library. See: Schematic Design: Symbol and Part Reload.
- Reload parts in the schematic design from the Master library. See: Schematic Design: Symbol and Part Reload.
- Perform a Forward Annotation of the schematic into the PCB design. See: PCB Design: Forward Annotation from Schematic.
- Reload all library data items in the PCB design from the Master library. See: PCB Design: All Data Reload.
- Import the corresponding Technology from the Master Library. See: PCB Design: Technology Library Import.
- Import the corresponding Design Rules from the Master Library. See: PCB Design: Design Rule Library Import.
- Perform a Design Rule Check on the PCB design. See: Schematic and PCB Design: Execute DRC.
Note
For further information regarding the results of the post migration tasks, see: Appendix H: Additional Notes.
For further information regarding the results of the post migration tasks, see: Appendix H: Additional Notes.